您的當前位(wèi)置(zhì): 首(shǒu)頁(yè) > 關於我們 > 和明以主承建商
和(hé)明以(yǐ)主承建商

二性视频工程.jpg



Projects (as Main Contractor)


New Built Works Construction:

Residential Building, No. 4 Kent Road, Kowloon Tong

Residential Building, No. 147 Waterloo Road, Kowloon Tong

Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon

Commercial Building, 40 Kimberley Road, Tsim Sha Tsui

Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin

Seng Tak Central School Building Project, New Clear Water Road, Kowloon

Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12,
Yuen Long Pau Cheung Square, Yuen Long

Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon

E&M Works Construction:

Sha Tin Fo Tan Data Center Project


Redecoration Work

Kau To Shan and Hong Lok Yuen South Bay, Shouson Hill, Mount Kellett and other luxury residential decoration.


和明(míng)以主承(chéng)建商的身份(fèn)完成了
:

1.尖沙咀金巴(bā)利道40號(hào)商業大(dà)廈建築工程(整單所有項目)

2.香(xiāng)港觀塘(táng)新清水灣道重置香港扶幼會盛德中(zhōng)心學校建築工程(整單所(suǒ)有項目)

3.香港沙田嶺道11號住宅建築工程

4.沙(shā)田火(huǒ)炭(tàn)數據中心(xīn)工程(機電設備連裝修(xiū))

5.九肚山以及康樂(lè)園南灣、壽臣山、加列等豪宅裝修等

6.大角咀道245-247號住宅大樓建築工程(chéng)(整單所有項目)

7.九龍塘根(gēn)德道4號(hào)單幢式住(zhù)宅(zhái)

8.九龍塘窩打老(lǎo)道147號單幢式住宅

9.尖沙咀加連威老道24A&24B大廈(shà)

10.元朗炮(pào)仗坊 8-12

11.旺角上海街445號住宅大

12. 屯門環保園廢(fèi)紙回收廠房及其(qí)他相關的發展(zhǎn)項(xiàng)目之P1地(dì)段(duàn)

Projects (as Sub Contractor)


Civil Engineering:

Hong Kong's Siu Sai Wan Park Drainage Project,

Government Development Department's Tin Shui Wai Wooden Bridge Project,

Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.

Hong Kong Siu Sai Wan Park Steel Structure Project, Stainless Steel Project,

Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.


A&A Works Construction:

The renovation project of Sha Tin Railway Station including steel structure engineering and   reinforced concrete structure works.


Steel Structure Engineering

Shanghai Lu Pu Bridge Steel Structure Engineering.


Design and manufacture of installation works:

Mobile safety fence in the Wan Chai - Central Phase II reclamation works.



Other projects completed by the Company include:

Shatin Vista Paradiso external area ; site wooden & steel decoration work



土搞事情视频,耍流氓视频,曰批,日屁程

1.香港小(xiǎo)西灣(wān)公園渠務工程 A
2.政府(fǔ)拓展署天水(shuǐ)圍木(mù)橋工(gōng)程
3.東(dōng)涌路擴建工程中7公(gōng)里的擋土墻工程
4.第(dì)三期填(tián)海(hǎi)2009/19的(de)高速(sù)工程的防撞欄工(gōng)程(chéng)
5.機場鐵路(lù)油庫鋼結構,鋼(gāng)結構(gòu)、路面、渠道工程、混凝土結構(gòu)以及渠務工程
6.香港小西灣海(hǎi)濱公園鋼(gāng)結(jié)構工程、不銹鋼工(gōng)程
7.加建、建工程(chéng):沙田火車站的改(gǎi)造工程包(bāo)括鋼結構工(gōng)程、鋼筋混凝結構工程(chéng)
8.鋼結構(gòu)工程(chéng):上海盧浦大橋鋼(gāng)結構工程(chéng)
9.設計與制造安裝工程-灣仔至中環第二(èr)期填海工程(chéng)中的移動式安全圍欄的設(shè)計、制造工(gōng)程

其他(tā)工程

沙田(tián)聽濤雅苑外欄(lán)&裝(zhuāng)飾工程(chéng)(木器鐵器(qì))